Royal Savannah and Diaspora Community Development Trust crest

SAVANNAH DEVELOPMENT DIVISION · GLOBAL EXCHANGE R&E CORPORATION

Royal Savannah and Diaspora Community Development Trust

The Trust office leads the operations and management of the Savannah Development division. All Zion Trust development projects fall under this office’s management, including the estates, residential and agricultural programs and associated civic, hospitality and community-development projects.

Development applications are received for Trust and development-committee review. Members are welcome to express interest in development committees and board-of-directors selections.

Trust office and participation Temporary contact: earthmanherbals@gmail.com

Damongo construction benchmarks and development pricing

Complete-building cost worksheet: materials, labour and services

Updated 16 October 2026. This worksheet builds an itemised estimate from quantities and rates, then divides by measured gross floor area. Published listings and indicative wage ranges are prefilled where available; they are not signed supply or labour contracts. Blank values mean pending, never zero. No actual complete-building rate is established yet.

Construction rate/m² = total measured materials + labour + plant + installed services + finishes + appliances + contractor costs, divided by gross m². Construction resale component = that complete construction subtotal × 1.50. Add land and separately established non-construction development costs afterward. Do not add this bottom-up schedule to the AECOM building benchmark: they are alternative estimating approaches for comparison.

Use one labour basis per trade: worker-days × agreed wage, or an inclusive subcontract price. For an inclusive subcontract, put its total on that trade's materials row and enter zero for separate labour, with the inclusion documented in your contract. Worker-days require agreed crew size, workdays, productivity, overtime, travel/accommodation and payment terms.

100 m² is a calculation example only. Set each quantity from drawings or the contractor's takeoff. Enter 0 explicitly for an excluded item; a zero quantity is not a missing quote. Changes are calculations in this browser only.

Trade / itemUnitMeasured quantityLow GHS/unitHigh GHS/unitExtended GHSEvidence / remaining requirement

Illustrative fixture package: one each of the seven bathroom/kitchen fixture items above totals GH₵14,549 supply only, or GH₵145.49/m² when allocated over 100 m². Cooker plus microwave adds GH₵3,595, or GH₵35.95/m². Combined GH₵18,144 / GH₵181.44 per 100 m², before refrigerator, pipes, wiring, installation, transport and taxes not confirmed in the listings. This is a selected specification, not an assumed package for every unit.

High-rise scope: shared stairs, lifts, core walls, fire protection, pumping, vertical services and common areas must be measured and allocated once. Low-rise house rates or a single slab cannot establish a tower cost.

Evidence and contractual status

Next unresolved inputs: measured architectural/structural and services takeoffs, approved fixture/appliance schedule, delivered Damongo supplier quotations with validity/taxes, and written trade/subcontract terms. No supplier has been engaged or paid through this worksheet. Agricultural costs and separate commercial programmes are not changed.

Local concrete and aggregate costing - revised scope, 16 October 2026

Current investigation: local concrete / structural-material cost per m², not a complete finished-building rate. US$100-150/m² is the owner's proposed target range for testing against a measured bill of quantities. It is not a verified Damongo tender or a correction to the published AECOM figures below, which remain a separate whole-building comparison. Do not use the target as a final apartment sale offer.

Supplier-listed inputs checked 16 October 2026

Eli Ghana supplier listing: Portland cement GH₵95 per 50 kg bag; 16 mm reinforcement GH₵140 per 6 m length; 32 MPa ready-mix concrete GH₵1,850/m³; solid 6-inch blocks GH₵9 each. Listing has no stated price effective date. Supplier confirmation, Damongo delivery, taxes and scope remain pending. Ready-mix already contains cement, sand and stone; do not add them again.

Illustrative slab thicknessConcrete volume per m²Concrete only, GH₵/m²
150 mm0.150 m³277.50
200 mm0.200 m³370.00
250 mm0.250 m³462.50

Thicknesses demonstrate unit arithmetic, not structural specifications. Concrete per m² = thickness in metres × GH₵1,850/m³. For a 9.290304 m² reference area and 150 mm slab: 1.3935456 m³ × GH₵1,850 = GH₵2,578.06 concrete only. Foundations, beams, columns, core walls and roof are additional concrete volumes allocated to gross floor area.

Local materials rate per m² = [concrete volume × delivered concrete rate + reinforcement mass × delivered steel rate + block quantities × block rate + separately measured mortar and other materials] ÷ gross floor area. An on-site concrete alternative must instead price approved cement, sand, coarse aggregate, water and admixture quantities per m³; current Damongo sand/stone quotes and approved mix design are unavailable. Formwork, labour, plant, transport, wastage and contractor overhead must then be measured separately to obtain installed structural cost.

Owner target arithmetic - not verified building costs

Area basisAt US$100/m²At US$150/m²With 50% markup
Per m²$100$150$150-$225
9.290304 m² reference area$929.03$1,393.55$1,393.55-$2,090.32
100 m² gross area$10,000$15,000$15,000-$22,500

These calculations cover only the cost scope assumed by the target. Complete apartments still require the remaining structure, labour, services, windows, finishes, appliances, land and other development costs. A materials-only markup must not be represented as the price of a completed apartment. All quantities require measured design; no engineering or code approval is implied.

Current construction pricing policy - 16 October 2026

Construction estimate C = measured gross floor area (m²) × applicable Accra benchmark (USD/m²). Resale construction component = C × 1.50. The 50% increase includes the resale markup; it is not a separate inflation reserve. This replaces the previous construction uplift and revenue-margin formula. No additional automatic markup or contingency is stacked on this calculation.

Measure each apartment's practical net area and allocate walls, circulation, cores and common building areas once to determine gross construction area. Existing concept sizes and 70% net-to-gross efficiency are illustrative until measured by the design team; they do not establish code compliance.

Land, site preparation, infrastructure, fixtures/appliances and fitout excluded from the benchmark, professional fees, taxes and financing remain separate, reconciled cost lines. Preliminary combined amount = 1.50 × construction cost + allocated land + other separately established costs. No second markup is assumed on those separate lines. Final sale offers remain pending complete costs and approved layouts.

Owner's latest land planning assumptions: Savannah / Zion Trust Estates US$20,000/acre; in-town Civic Center US$30,000/acre (17 acres = US$510,000); other development land US$25,000/acre. These are owner allowances, not verified acquisition costs or public land offers.

Source: AECOM Africa Property & Construction Cost Guide 2025/26, Accra, page 75; cost date 1 July 2025, FX date 1 May 2025. These are dated published benchmarks, not 2026 Damongo supplier quotations. A 50% cost markup equals 33.33% gross margin on the construction component before excluded costs.

Current formula, apartment calculations and project schedules. All pending construction proposals use this policy; prior financial schedules are superseded.

Published Accra rates and construction resale component

CategoryBenchmark USD/gross m²Construction resale: × 1.50
Standard residential high-rise$2,293$3,440
Luxury residential high-rise$2,704$4,056
Prestige detached house$2,589$3,884
Standard office high-rise$2,100$3,150
Major shopping centre$1,729$2,594
Multi-storey parking$1,000$1,500
Primary / secondary school$1,294$1,941
District hospital$2,001$3,002

Reference rates exclude land, external site works, professional fees, tenant fitout/equipment and GST/VAT; reconcile full category scope against the bill of quantities. Use whole-building measured areas, not isolated room multiplication.

Measurement and evidence

Use practical apartment layouts in m² and measured gross construction area. Current rates and assumptions are in the dated policy above; excluded costs stay pending quotations. No per-room target is a construction quotation.

204-unit residential option - square-metre model

UnitNet m²Allocated gross m²CountConstruction CC × 1.50Land sharePartial combined amount
1 bedroom4057.1496$131,029$196,543$70$196,613
2 bedroom5578.5772$180,164$270,246$96$270,343
3 bedroom85121.4324$278,436$417,654$149$417,802
4 bedroom120171.438$463,543$695,314$210$695,524
5 bedroom160228.574$618,057$927,086$280$927,365

Concept net areas: 40, 55, 85, 120 and 160 m²; gross = net ÷ 0.70, pending measured design. One estate acre at US$20,000 allocated by net area across 11,440 m². Standard rate applies to 1-3 bedrooms; luxury rate to 4-5 bedrooms. Construction total US$38,413,600; construction resale component US$57,620,400; land US$20,000; partial combined amount US$57,640,400 before unpriced costs. No final unit sale price, mortgage or return is asserted. This 204-unit option is separate from the Civic Center 328-flat concept.

17-acre Civic Center - benchmarked scope

ComponentConcept gross m²USD/m²Construction CC × 1.50
Standard condominium accommodation38,000.00$2,293$87,134,000$130,701,000
Penthouse accommodation1,600.00$2,704$4,326,400$6,489,600
Ground-floor retail2,828.57$1,729$4,890,598$7,335,896
Office / administration9,000.00$2,100$18,900,000$28,350,000
Shopping / supermarket4,500.00$1,729$7,780,500$11,670,750
Concession shells500.00$1,729$864,500$1,296,750

Benchmark construction subtotal $123,895,998; construction resale equivalent $185,843,996. Land allowance: 17 × US$30,000 = US$510,000. Partial combined arithmetic $186,353,996 before excluded costs. This is not a full district budget or a forecast of public-amenity sales. Areas are concept assumptions. Theatre, conference, emergency services, water garden, roads, off-grid utilities, specialist fitout/equipment, fees, tax and finance require separate estimates. Retail uses the shopping-centre proxy; reconcile benchmark inclusions to avoid duplicate fixtures.

Ten-acre concept block alternatives

BlockHomesGross m²Construction CC × 1.50Estate landPartial amount
A mixed-use34038592$86,867,136$130,300,704$200,000$130,500,704
B residential28831104$71,321,472$106,982,208$200,000$107,182,208
C waterfront21631400$82,644,600$123,966,900$200,000$124,166,900

Each alternative uses ten estate acres at US$20,000/acre. Retained concept geometry and category allocations require measured design; alternatives must not be added together. Land and unquoted infrastructure, fitout, fees, tax and finance remain separate. No complete block selling value is asserted.

Measurement and evidence

Use practical apartment layouts in m² and measured gross construction area. Current rates and assumptions are in the dated policy above; excluded costs stay pending quotations. No per-room target is a construction quotation.